|
|
- Mainly used for reclaiming material from stockpiles where homogenization is the primary requirement.
- Where non sticky materials make up the pile.
- To be equipped with or without rake.
- Capacity may be controlled more closely because cutting depth does not change when traversing.
|
|
|
| Main data |
| Materials to be handled | iron ore |
| Nominal capacity | 2 000 t/h |
| Rail gauge | 41 m (135 ft) |
| Number of bucket wheels | 1 |
| Belt width | 1 200 mm (47 ft) |
| Project data |
| Project name | Gol e Gohar |
| Location | Iran |
| Year of delivery | 1993 |
|