|
|
- Mainly used for reclaiming material from stockpiles where homogenization is the primary requirement.
- Where non sticky materials make up the pile.
- To be equipped with or without rake.
- Capacity may be controlled more closely because cutting depth does not change when traversing.
|
|
|
| Main data |
| Materials to be handled | phosphate |
| Nominal capacity | 1080 t/h |
| Rail gauge | 40 m (131 ft) |
| Number of bucket wheels | 2 |
| Belt width | 1200 mm (47 ft) |
| Project data |
| Project name | Kef Schfair |
| Location | Tunisia |
| Year of delivery | 1982 |
|