|
|
- Super-duty machine.
- Minimizes the migration of the center of gravity in operation to allow very high capacities and an economic rail gauge and to keep utilizable stockyard width at a maximum.
|
|
|
| Main data |
| Materials to be handled | coal |
| Nominal capacity | 6500 t/h |
| Boom length | 55 m (180 ft) |
| Belt width | 2000 mm (79 in) |
| Project data |
| Project name | Tianjin Port |
| Location | China |
| Year of delivery | 2003 |
|