|
|
- Radial travelling on rails.
- Boom with slewing, shuttling and luffing function.
- Material transfer from the feed chute at the pivot structure to the boom tip.
- Slewable chute and spout for efficient material distribution.
- Suitable for short ship-loading time because of tidal action.
|
|
|
| Main data |
| Materials to be handled | sulphur |
| Nominal capacity | 4000 t/h |
| Outreach seaside | 32 m (105 ft) |
| Rail gauge | 34 m (112 ft) |
| Belt width | 1800 mm (71 in) |
| Project data |
| Project name | Qatar Ras Lafan |
| Location | Qatar |
| Year of delivery | 2007 (2 units) |
|