|
|
- Longitudinal travelling on rails.
- Boom with shuttling and luffing function.
- Equipped with special discharge hood around the head pulley to contain any dust generated.
|
|
|
| Main data |
| Materials to be handled | iron ore |
| Nominal capacity | 13200 t/h |
| Outreach seaside | 14-46 m (46-151 ft) |
| Rail gauge | 23 m (75 ft) |
| Belt width | 1800 mm (71 in) |
| Project data |
| Project name | Finucane Island |
| Location | Australia |
| Year of delivery | 2003 |
|