|
|
- Longitudinal travelling on rails.
- Boom with slewing and luffing function.
- Capable of loading ships on either side of the wharf.
- Discharge chute is equipped with a cascade flow chute to provide dustless transfer.
|
|
|
| Main data |
| Materials to be handled | bauxite |
| Outreach seaside | 33 m (108 ft) |
| Nominal capacity | 6500 t/h |
| Rail gauge | 12.1 m (40 ft) |
| Belt width | 1800 mm (71 in) |
| Project data |
| Project name | NeWeipa |
| Location | Australia |
| Year of delivery | 2006 |
|