|
|
- Longitudinal travelling on rails.
- Boom with slewing and luffing function.
- Capable of loading ships on either side of the wharf.
- Equipped with head chute deflector plate to direct and degrade the ore stream during loading of the ships.
|
|
|
| Main data |
| Materials to be handled | iron ore |
| Outreach seaside | 44.6 m (146 ft) |
| Nominal capacity | 11 600 t/h |
| Rail gauge | 13.7 m (45 ft) |
| Belt width | 1600 mm (63 in) |
| Project data |
| Project name | Cape Lampert |
| Location | Australia |
| Year of delivery | 2001 |
|