|
|
- Designed to connect the iron ore crusher station to washing system of Corrego do Feijão Mine.
- Mine comprises 4 belt conveyors.
- Largest regenerative conveyor with 1130 m (3 707 ft)
- Level difference of 162.2 m (532 ft)
|
|
|
| Main data |
| Nominal capacity | 1200 t/h |
| Material to be handled | iron ore |
| Length | 1260 m (4 134 ft) |
| Project data |
| Project name | Brumadinho-MG K7015 |
| Location | Brazil |
| Year of delivery | 1998 |
|