|
|
- Alegria 9 mine comprises one short belt conveyor and one long distance regenerative (partly) belt conveyor.
- Regenerative belt conveyor travels across the mountain, where as the drive to be installed on top of the mountain.
- Level difference of 124 m (407 ft).
|
|
|
| Main data |
| Nominal capacity | 3785 t/h |
| Material to be handled | iron ore |
| Length | 1940 m (6365 ft) |
| Project data |
| Project name | Mariana-MG K7009 |
| Location | Brazil |
| Year of delivery | 1998 |
|